Case Studies

fdr-dunsop-image

Flood Risk and Drainage – Dunsop Trout Farm

05.08.2015

Comparison of flood levels using topographical data showed that the proposed residence was actually in Flood Zone 2 and, while the site was still at flood risk, the developmen...

frd-bolton-image

Flood Risk and Drainage – Bolton Council

05.08.2015

The client wished to gain outline planning consent to develop a site for a multi-user games area, adjacent to an existing primary school and on an area previously used as a bl...

frd-affordable-image

Flood Risk and Drainage – Affordable Homes Consultancy

05.08.2015

The LK Group was appointed to undertake Flood Risk Assessments (FRAs) to support linked planning applications for remediation and then development on the site of an old gas-wo...

asbestos-bury-image

Asbestos – Emerson Group

05.08.2015

The Emerson Group was planning a full refurbishment of a four storey office block of 1960s brick and concrete construction. The LK Group was appointed to manage the safe remov...

asbestos-sunderland-image

Asbestos – Sunderland

05.08.2015

In 2005 a competitor completed an asbestos survey of a large call and distribution centre, with many areas within the plant room deemed to be asbestos or coated in asbestos la...