Case Studies

cardinal-street-image

Geoenvironmental – Taylor Wimpey

21.07.2015

The site of a former warehouse and textile mill was to be redeveloped but for various reasons the site was deemed unfit. Issues identified on site included a chimney, boiler h...

bullock-image

Retrofit – Bullock Construction

21.07.2015

A vacant property in Stoke-on-Trent was due for refurbishment by Bullock Construction Ltd in order that the property could be brought back into rental use. They decided to inv...

berkshire-image

Land Remediation – Berkshire Homes

21.07.2015

Berkshire Homes approached The LK Group to remediate this brownfield site for residential development. The site became grossly contaminated with multi-component hydrocarbon li...

barnett-forest-sap-image

SAPs – Barnett Forest Homes

21.07.2015

We were asked to undertake the Design SAP calculations on a development of four terraced houses. Our client submitted a set of drawings with the specification of each of the f...

bardsley-image

Japanese Knotweed – Bardsley Construction

21.07.2015

The LK Group devised a management plan which comprised a combination of treatments. Designated Area A was subject to a ‘dig and dump’ operation. A semi-permeable membrane ...