SAP Modelling – Major Registered Povider

major-rp-image

The LK Group was commissioned to provide SAP modelling for house types on a new build social housing development. The aim was to establish design options for Level 3 or Level 4 of the Code for Sustainable Homes, allowing the final optimum design specification to be fixed and accurately costed. Variables to be considered in the design modelling were: u-values, Mechanical Vent Heat Recovery (MVHR), GasSaver, Photovoltaic panels (PV).